Don’t start with the charger

Most people ring around for quotes before they've asked the one question that matters: can my house handle it? A good ev charger installer Sydney homeowners can trust will ask about your power setup first, the charger second. Your car doesn't care what brand of wall box you buy. It cares how much power gets to it, and how safely. A charger is basically a smart, protected extension lead for your car, and it pulls a lot of current for hours at a time. Way more than a kettle. So the electrical side has to be right before anything gets bolted to a wall. Get that wrong and you're looking at tripping breakers, hot cables, or worse.

Switchboard

Investigate your switchboard. Issues may arise if it contains old fuse units, is overloaded and/or lacks available room. As a charger will require its own dedicated fuse, there must be suitable room on the switchboard. Again, if it is old, has been cobbled together over many years or is already at capacity, it may require upgrading. Although disappointing, it is preferable to discover this ahead of installation. Often we find switches have been added to a switchboard in a haphazard fashion and, unfortunately, you cannot simply add a high demand item to such a system in the hope that everything will work. Your electrician should analyse your switchboard, assess available room and investigate your main electricity supply.

Dedicated circuit

Absolutely essential. An EV charger is supplied via a dedicated circuit from the switchboard. It is not connected to circuits for, for example, garage lights, laundry facilities and/or wall sockets. Charging occurs almost continuously and at a high level. Typical domestic circuits are not designed for this. The thickness of cable will depend on the charger and also the distance from the switchboard – the further away, the thicker the cable (to prevent voltage loss). Again, poor quality or hastily installed cables can cause issues and these are not always immediately apparent.

Single or three phase?

 

The majority of Sydney houses receive single phase electricity. This is adequate for the majority of people. Charging levels of around 7kW can generally be achieved and this is sufficient for the average daily mileage. Three phase provides quicker charging speeds – up to 11kW or more – but again, both your property and your car must be able to support this. Sadly, many cars can’t. Don’t therefore pay for a three phase installation if your car is only compatible with single phase. Examine your car’s on-board charger details, then investigate your electricity meter and supply. Finally, ensure that your charger is compatible with both. Avoid opting for the largest charger available.

Property type considerations

There are particular considerations for properties in eastern suburbs. For example, restricted side access, sandstone construction, seventies or older switchboards and communal rear parking. Again, for an eastern suburbs property, an electrician installing an EV charger is likely to spend time analysing cable paths and switchboard capacity, in addition to installation. Within apartments, body corporate permission is frequently necessary. Furthermore, electricity is often sourced from a communal area and sub-metering will probably be implemented. Semi-detached properties can also have shared electricity provision which can create additional complexities. Whilst none of these are unmanageable, site investigation becomes evermore crucial compared to receiving a telephone quote.

Essential safety considerations

Correct fuse, and RCD (again more stringent than for standard sockets) units are key to a competent installation. Good earthing is also vital. If your charger is external or in an uncovered carport then it must be weatherproof so consider the IP rating and location. Electrical installation must conform to Australian standards (AS/NZS 3000) together with specific guidelines for EV charging. The charger itself should also be approved and utilise the standard Type 2 plug format used in Australia. Again, these are not intended to cause hassle, but rather to avoid dangerous situations developing into fires.

Solar, load control and costs

If you have solar panels then in many cases you can synchronise your charging with periods of the day when you are generating electricity (provided your charger has this facility). Furthermore, some chargers incorporate load control. This allows them to reduce their charging output when the house is experiencing high demand so that the main electricity switch is not triggered by, for example, an operating oven and air-con. This is especially relevant for smaller electricity supplies. Additionally, off-peak electricity rates can heavily impact upon annual costs if you charge at night. A competent electrician will analyse your actual electricity usage patterns and on this basis, advise you on an appropriate charger. They won’t merely offer whatever charger is available in their van at that moment.

Licence, permissions and who to employ

Unfortunately, this is not a task for the average person to undertake, nor should it be carried out by a friend claiming to have ‘some’ electrical knowledge. In NSW, electricians must be licensed to install EV chargers. They will both test the electrical circuit and then issue certification. Occasionally, your electricity network supplier will also need to be informed, particularly for larger chargers and/or higher electricity demands. Failure to complete necessary documentation can create difficulties for both insurance and future property sales. At Pica Electrical we always conduct a site survey, clearly outline requirements in easy to understand terms and then provide an accurate cost quotation. Should we determine that your switchboard requires upgrading, we will inform you of this at the survey stage. No matter who you engage, ensure that you clarify what is encompassed within the service offered.

FAQs

Is a switchboard upgrade always required?

Possibly not. If there is sufficient room, your switchboard is in good condition and your electricity supply can support increased demand then you may not need an upgrade. Typically, however, older switchboards do require upgrading so again, on-site investigation is recommended.

Can I charge my EV from a standard socket?

Yes – using the portable lead that is often provided for this purpose. However, this is a slow method and so is not really suitable for frequent charging. A wall-mounted charger is quicker and is designed for continuous, high-level charging.

How long does installation typically take?

Installation can often be completed in a few hours where the switchboard is near to where parking occurs. More time is required if there is lengthy cable runs, switchboard upgrading and/or if apartment body corporate permission is required.

 

Is council permission necessary?

Generally speaking, it is not for standard property installations. Usually, however, body corporate permission is required for apartments and strata properties. Your electrician will be able to advise you on this.

Conclusion

Whilst home EV charging is not overly complex, electrical factors are important. These include having a well maintained switchboard, dedicated circuits, suitable safety equipment and a qualified electrician to certify the installation. Omitting any of these elements plays with your house’s safety. To locate eastern suburbs homeowners who can competently install an EV charger, firstly ensure that a thorough site survey is conducted and that you ask plenty of questions. Here at Pica Electrical we are pleased to discuss in detail your property’s requirements. Arrange a site visit, establish key information and then select your charger.