Prices At Fuel Pump And Soaring Ev Interest Puts Australian Technology In Prime Position
Prices at the fuel pumps started to spike in recent weeks is driving consumer interest in electric cars. In the case of petrol, the price has climbed a phenomenal 50 per cent in the past 14 months. Demand for electric vehicles is ramping up across the world amid expectations petrol prices will reach record levels in the future months and coming years.
The volume of inquiries for both new and used EVs has reached record levels. Commentators have said that some good could come of that pain, including greater energy independence and a faster path to net zero emissions.
In other Lithium-ion battery news, Elon Musk has recently opened Tesla’s Berlin Gigafactory. Elon Musk presented the keys to the first Model Y electric cars off the production line, and declared that scale was the key to complete the switch from a fossil fuel economy to a sustainable energy future. “Every vehicle that we make is another step in the direction of a sustainable energy future,” Musk said at the opening.
The Gigafactory opening was attended by German chancellor Olaf Scholz, who said it was a crucial day for the transition to electric mobility in Germany, where 14 per cent of new car sales are already electric. The Giga factory is situated in the state of Brandenburg, Germany.
A company that is in a prime position to benefit from this latest oil price movements and increased European EV market, is an Australian company that is in the process of establishing a 10,000 tpa battery materials plant in the nearby state of Saxony, Germany.
This Company recently announced its game changing break through technology of incorporating high capacity silicon in lithium-ion batteries. The Company announced in late 2021 that it had achieved a 30% higher energy battery with improved cyclability or battery life. Higher density batteries result in smaller and lighter batteries and substantially less greenhouse gases. The Company is in the race to get their patented technology to market with recent land purchases, commencement of a pilot plant and progress on a pre-feasibility study for a 10,000 tpa plant in Saxony, Germany.